• DocumentCode
    3080388
  • Title

    Mixed Backlogging and Outsourcing Models with Inventory Capacity

  • Author

    Zhong, Jinhong ; Chu, Feng ; Chu, Chengbin ; Yang, Shanlin

  • Author_Institution
    Univ. de Technol. de Troyes, Troyes
  • Volume
    6
  • fYear
    2006
  • fDate
    8-11 Oct. 2006
  • Firstpage
    4546
  • Lastpage
    4551
  • Abstract
    In this paper we consider a dynamic lot sizing model with mixed backlogging and outsourcing and bounded inventory, in which outsourcing may occur in a period even if the inventory level at that period is positive. The production cost may include setup cost and the production level is unlimited. The holding, backlogging and outsourcing cost functions are linear. Furthermore, backlogging level at each period is limited, and outsourcing level at each period cannot exceed the demand of that period. The goal is to minimize the total cost of production, inventory holding/backlogging and outsourcing. We show that this problem can be solved in O(T4 log T) time where T is the length of the planning horizon. Finally, the proposed algorithm is implemented in C++ and evaluated on a large variety of instances generated randomly.
  • Keywords
    computational complexity; inventory management; lot sizing; outsourcing; bounded inventory capacity; dynamic lot sizing model; inventory holding; mixed backlogging; outsourcing cost function; outsourcing level; outsourcing model; production cost minimization; production level; Computational complexity; Cost function; Cybernetics; Dynamic programming; Heuristic algorithms; Lot sizing; Outsourcing; Polynomials; Production; Subcontracting;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man and Cybernetics, 2006. SMC '06. IEEE International Conference on
  • Conference_Location
    Taipei
  • Print_ISBN
    1-4244-0099-6
  • Electronic_ISBN
    1-4244-0100-3
  • Type

    conf

  • DOI
    10.1109/ICSMC.2006.384862
  • Filename
    4274628