Evaluation of Criticality Analysis Measurements in Resource-Constrained Projects
Author
Cui, Wanan ; Song, Bin ; Yue, Chaoyuan ; Qin, Jiajun
Author_Institution
Huazhong Univ. of Sci. & Technol., Wuhan
Volume
6
fYear
2006
fDate
8-11 Oct. 2006
Firstpage
4709
Lastpage
4716
Abstract
Criticality analysis of activity and path is an important problem in resource-constrained projects. This paper proposes the method of minimal feasible sets (MFS) for the identification of critical activities and critical sequences. And then, we compare MFS with seven related previous methods. Computational results manifest that MFS does not perform inferior to other methods at least and excel them in most situations in establishing resource links and computing floats.
Keywords
PERT; critical path analysis; project management; scheduling; set theory; PERT model; criticality analysis measurement; minimal feasible set; project management; resource-constrained project scheduling; Algorithm design and analysis; Chaos; Cybernetics; Delay effects; Geoscience; Mathematical model; Processor scheduling; Project management; Risk management; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2006. SMC '06. IEEE International Conference on
Conference_Location
Taipei
Print_ISBN
1-4244-0099-6
Electronic_ISBN
1-4244-0100-3
Type
conf
DOI
10.1109/ICSMC.2006.385048
Filename
4274657
Link To Document