• DocumentCode
    3080921
  • Title

    Evaluation of Criticality Analysis Measurements in Resource-Constrained Projects

  • Author

    Cui, Wanan ; Song, Bin ; Yue, Chaoyuan ; Qin, Jiajun

  • Author_Institution
    Huazhong Univ. of Sci. & Technol., Wuhan
  • Volume
    6
  • fYear
    2006
  • fDate
    8-11 Oct. 2006
  • Firstpage
    4709
  • Lastpage
    4716
  • Abstract
    Criticality analysis of activity and path is an important problem in resource-constrained projects. This paper proposes the method of minimal feasible sets (MFS) for the identification of critical activities and critical sequences. And then, we compare MFS with seven related previous methods. Computational results manifest that MFS does not perform inferior to other methods at least and excel them in most situations in establishing resource links and computing floats.
  • Keywords
    PERT; critical path analysis; project management; scheduling; set theory; PERT model; criticality analysis measurement; minimal feasible set; project management; resource-constrained project scheduling; Algorithm design and analysis; Chaos; Cybernetics; Delay effects; Geoscience; Mathematical model; Processor scheduling; Project management; Risk management; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man and Cybernetics, 2006. SMC '06. IEEE International Conference on
  • Conference_Location
    Taipei
  • Print_ISBN
    1-4244-0099-6
  • Electronic_ISBN
    1-4244-0100-3
  • Type

    conf

  • DOI
    10.1109/ICSMC.2006.385048
  • Filename
    4274657