• DocumentCode
    3081826
  • Title

    The research on conformance testing platform of numerical substation

  • Author

    Chen, Jiongcong ; Ren, Yanming ; Gao, Xinhua ; Jin, Yangjun

  • Author_Institution
    Guangdong Power Test & Res. Inst., Guangzhou, China
  • fYear
    2008
  • fDate
    10-13 Dec. 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Communication in numerical substation is very complicated. It is necessary to perform the conformance testing for devices in numerical substation. Three types of conformance testing are provided in this paper. 1)system performance oriented testing, 2)function oriented testing, 3)communication services oriented testing. The relationships among the three types of testing are analyzed. Three types of conformance testing guarantee three type of interoperation of devices in numerical substation. The interoperation based on communication services is the base of the interoperation based function. The function oriented conformance testing has closer relationship with the real project. IEC61850-10 was specified for the conformance testing of communication services. Its limitation is analyzed. The requirements of function oriented testing for the devices on station level, bay level and process level in numerical substation are studied. The idea on how to set up a conformance testing platform for numerical substation is introduced. The concrete function oriented testing platform is provided. The application and effect of the testing platform are given.
  • Keywords
    IEC standards; conformance testing; substations; IEC61850-10; bay level; communication services oriented testing; conformance testing; function oriented testing; interoperation based function; numerical substation; process level; station level; system performance oriented testing; Automatic control; Automatic testing; Certification; Communication standards; Communication system control; Electronic mail; IEC; Manufacturing; Substation automation; Substation protection; Conformance; IEC61850; Interoperation; Numerical Substation; Testing Platform;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electricity Distribution, 2008. CICED 2008. China International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-1-4244-3373-5
  • Electronic_ISBN
    978-1-4244-3372-8
  • Type

    conf

  • DOI
    10.1109/CICED.2008.5211709
  • Filename
    5211709