Title :
Investigation of 2008´ frozen disaster and research on de-icing in Guangdong power grid
Author :
Liu, Ping-yuan ; He, Hong-ming ; Pan, Chun-ping
Author_Institution :
Guangdong Power Grid Corp. Electr. Power Res. Inst., Guangzhou, China
Abstract :
In early 2008 in Guangdong Province in northern Guangdong power grid suffered a serious frozen disaster. The disaster situations of northern Guangdong power grid such as collapse of towers, breakage of lines and damages of transforming equipments are discussed, and the causes and lessons from the frozen disaster damage are summarized. The analysis on the frozen disaster of North Guangdong power grid shows routing selection and improved permission design limit on the new and rebuilding lines should be focused. And effective anti-ice and removing-ice methods should be studied.
Keywords :
disasters; poles and towers; power grids; power overhead lines; power transformers; power transmission faults; antiice method; frozen disaster damage; lines breakage; northern Guangdong power grid de-icing; removing-ice method; routing selection; tower collapse; transforming equipment damages; Hazards; Ice; Large-scale systems; Ocean temperature; Poles and towers; Power grids; Power transmission lines; Rain; Snow; Substations; Frozen Disasters; Guangdong power Grid; Icing Areas; Lines Icing;
Conference_Titel :
Electricity Distribution, 2008. CICED 2008. China International Conference on
Conference_Location :
Guangzhou
Print_ISBN :
978-1-4244-3373-5
Electronic_ISBN :
978-1-4244-3372-8
DOI :
10.1109/CICED.2008.5211712