Title :
The victoria line upgrade: From concept to full operation
Author_Institution :
London Underground, United Kingdom
Abstract :
This paper describes the comprehensive renewal and upgrade of London Underground´s Victoria Line which is now in the final stages of delivery. It outlines the programme scope and the expected benefits, describes the new signalling and train control system and how the migration strategy influenced the design concept, and the regulatory and assurance arrangements that have been applied. The paper concludes by reviewing service experience and the reliability growth of the new assets. No diagrams or illustrations are included in this paper; these are to be found in the accompanying presentation.
Keywords :
ATC; CBTC; DTG-R; Victoria; metro;
Conference_Titel :
Railway Signalling and Control Systems (RSCS 2012), IET Professional Development Course on
Conference_Location :
London, UK
Print_ISBN :
978-1-84919-629-1
DOI :
10.1049/ic.2012.0052