DocumentCode
3096784
Title
The victoria line upgrade: From concept to full operation
Author
Orsman, M.R.
Author_Institution
London Underground, United Kingdom
fYear
2012
fDate
21-24 May 2012
Firstpage
191
Lastpage
204
Abstract
This paper describes the comprehensive renewal and upgrade of London Underground´s Victoria Line which is now in the final stages of delivery. It outlines the programme scope and the expected benefits, describes the new signalling and train control system and how the migration strategy influenced the design concept, and the regulatory and assurance arrangements that have been applied. The paper concludes by reviewing service experience and the reliability growth of the new assets. No diagrams or illustrations are included in this paper; these are to be found in the accompanying presentation.
Keywords
ATC; CBTC; DTG-R; Victoria; metro;
fLanguage
English
Publisher
iet
Conference_Titel
Railway Signalling and Control Systems (RSCS 2012), IET Professional Development Course on
Conference_Location
London, UK
Print_ISBN
978-1-84919-629-1
Type
conf
DOI
10.1049/ic.2012.0052
Filename
6280842
Link To Document