• DocumentCode
    3096784
  • Title

    The victoria line upgrade: From concept to full operation

  • Author

    Orsman, M.R.

  • Author_Institution
    London Underground, United Kingdom
  • fYear
    2012
  • fDate
    21-24 May 2012
  • Firstpage
    191
  • Lastpage
    204
  • Abstract
    This paper describes the comprehensive renewal and upgrade of London Underground´s Victoria Line which is now in the final stages of delivery. It outlines the programme scope and the expected benefits, describes the new signalling and train control system and how the migration strategy influenced the design concept, and the regulatory and assurance arrangements that have been applied. The paper concludes by reviewing service experience and the reliability growth of the new assets. No diagrams or illustrations are included in this paper; these are to be found in the accompanying presentation.
  • Keywords
    ATC; CBTC; DTG-R; Victoria; metro;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Signalling and Control Systems (RSCS 2012), IET Professional Development Course on
  • Conference_Location
    London, UK
  • Print_ISBN
    978-1-84919-629-1
  • Type

    conf

  • DOI
    10.1049/ic.2012.0052
  • Filename
    6280842