• DocumentCode
    3096980
  • Title

    WAMS Implementation in China and the Challenges for Bulk Power System Protection

  • Author

    Yang, Qixun ; Bi, Tianshu ; Wu, Jingtao

  • Author_Institution
    Beijing Sifang Autom. Co. Ltd., Beijing
  • fYear
    2007
  • fDate
    24-28 June 2007
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Synchronized phasor measurement technology has been gaining increasingly interests in China due to its wide area time synchronization capability and fast transmission speed. Over 10 years of implementation of wide area measurement system (WAMS) in Chinese power grid have shown its great value in power system dynamic monitoring and potential applications in system modeling and validation, feedback control and system wide protection. This paper reviews the overall implementation of WAMS in China and analyzes the corresponding characteristics of WAMS. Moreover the challenges for bulk power system protection with synchronized phasor measurement technology are presented also.
  • Keywords
    phase measurement; power grids; power system measurement; power system protection; synchronisation; China; Chinese power grid; WAMS implementation; bulk power system protection; feedback control; power system dynamic monitoring; synchronized phasor measurement technology; wide area measurement system; wide area time synchronization; Area measurement; Gain measurement; Modeling; Monitoring; Power grids; Power system dynamics; Power system protection; Time measurement; Velocity measurement; Wide area measurements; Synchronized Phasor Measurement; power system; wide area measurement system; wide area protection;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2007. IEEE
  • Conference_Location
    Tampa, FL
  • ISSN
    1932-5517
  • Print_ISBN
    1-4244-1296-X
  • Electronic_ISBN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PES.2007.385835
  • Filename
    4275601