• DocumentCode
    3100013
  • Title

    PMU Challenges and Performance Issues

  • Author

    Weekes, M.A.

  • Author_Institution
    Manitoba Hydro, Winnipeg, MB
  • fYear
    2007
  • fDate
    24-28 June 2007
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Typical challenges encountered while installing phasor measurement instrumentation on your power system grid, which aid in power system security, are documented. The project of installing phasor measurement unit (PMU) devices is described from initiation through execution, operational experience, and testing. A brief business case, road map and results are discussed. The documentation is of significant value to prospective new champions for such devices on their system.
  • Keywords
    installation; power grids; power system measurement; power system security; PMU instrumentation installation; phasor measurement unit; power system grid; power system security; Cable TV; Computer security; Global Positioning System; Joining processes; Monitoring; Phasor measurement units; Power system security; Protection; Risk management; System testing; Global Positioning System; IEEE standards; acceptance testing; data rates; data security; latency; phasor measurement; protocol testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2007. IEEE
  • Conference_Location
    Tampa, FL
  • ISSN
    1932-5517
  • Print_ISBN
    1-4244-1296-X
  • Electronic_ISBN
    1932-5517
  • Type

    conf

  • DOI
    10.1109/PES.2007.386004
  • Filename
    4275770