Title :
The analysis on a successive forced outage in Chu-Sui HVDC system caused by DC line fault
Author :
Zhu, Taoxi ; Zhou, Hongyang ; Yu, Jiang ; Huang, Jiayi
Author_Institution :
Power & Control Center of China Southern Power Grid, China
Abstract :
In this paper, a complicated DC line fault taken place in ±800kV Chu-Sui HVDC transmission system is introduced. During this fault, DC line protection, DC filter differential protection and 82HSNBS protection of another pole acted, and two poles were stopped successively. Based on the theory of HVDC protection and control system and the transient recorders, the processing of the accident is analyzed, and combined with the interrelationship of bipolar DC line as the lightning strike, the characteristics of current transducers of DC filter and the influence of bypass switch closing, the improving suggestions are discussed, and some improving suggestions had put in practice.
Keywords :
HVDC power transmission; circuit breakers; electrical accidents; lightning protection; poles and towers; power filters; power system transients; power transmission control; power transmission faults; power transmission lines; power transmission protection; transducers; 82HSNBS pole protection; Chu-Sui HVDC transmission system; DC filter; DC filter differential protection; DC line fault; DC line protection; HVDC control system; HVDC protection system; accident processing; bipolar DC line; bypass switch closing influence; current transducers; lightning strike; successive forced outage analysis; transient recorders; Accidents; Delay; HVDC transmission; Inverters; Lightning; Rectifiers; Transient analysis; ±800kV; 82HSNBS; Bypass switch; DC filter differential protection; DC line fault;
Conference_Titel :
Transmission and Distribution Conference and Exposition (T&D), 2012 IEEE PES
Conference_Location :
Orlando, FL
Print_ISBN :
978-1-4673-1934-8
Electronic_ISBN :
2160-8555
DOI :
10.1109/TDC.2012.6281520