• DocumentCode
    3105087
  • Title

    UK solutions being implemented [switchgear maintenance]

  • Author

    Dakers, B.

  • Author_Institution
    Rolls-Royce T&D, UK
  • fYear
    1997
  • fDate
    35724
  • Firstpage
    42461
  • Lastpage
    42464
  • Abstract
    The age profile of switchgear in the UK, coupled with the drive for increased quality of supply, has given rise to a number of options being considered by electric utility asset managers. The choice of which option depends upon many factors: age and condition of equipment; system configuration; outage constraints; plant life; capital funding; health and safety; and system performance. The author has been involved with a whole range of solutions, overhaul/refurbishment, retrofit and replacement with new equipment. The paper highlights four examples of different solutions being implemented
  • Keywords
    switchgear; UK; electric utility asset management; overhaul; refurbishment; replacement; retrofit; switchgear maintenance;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Switchgear: Retrofit, Refurb or Replace - The Asset Manager's Dilemma (Digest No: 1997/348), IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19971173
  • Filename
    660325