• DocumentCode
    3111662
  • Title

    Managing the ASIC design to test process

  • Author

    Culbertson, Gary D.

  • Author_Institution
    GenRad Inc., Concord, MA, USA
  • fYear
    1988
  • fDate
    12-14 Sep 1988
  • Firstpage
    649
  • Lastpage
    656
  • Abstract
    The general ASIC (application-specific integrated circuit) design flow is discussed. Critical management milestones in the flow requiring judgement, action, or decisions are isolated and discussed. Key prerequisites that should be addressed as the designer moves from step to step in the flow are also discussed. The ASIC design process has a well established flow that is easily understood and managed. The techniques discussed can be adapted to most companies. Some companies will emphasize certain management milestones over others, depending on how many devices they have designed, the complexity of the devices they are attempting to design, the organization under which the CAE (computer-aided engineering) will be accessed and operated, and the relationship with the ASIC vendor
  • Keywords
    CAD/CAM; application specific integrated circuits; automatic testing; integrated circuit testing; production testing; ASIC design; CAD/CAM; CAE; IC testing; automatic testing; computer-aided engineering; production testing; Application specific integrated circuits; Computer aided engineering; Costs; Design engineering; Engineering management; Printed circuits; Process design; Project management; Scheduling; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Test Conference, 1988. Proceedings. New Frontiers in Testing, International
  • Conference_Location
    Washington, DC
  • ISSN
    1089-3539
  • Print_ISBN
    0-8186-0870-6
  • Type

    conf

  • DOI
    10.1109/TEST.1988.207848
  • Filename
    207848