• DocumentCode
    3117998
  • Title

    Initial experience in the Snowy Mountains Scheme with the PDA and installation and use of permanent capacitive couplers on hydro generators

  • Author

    Tychsen, Ross C.

  • Author_Institution
    Snowy Mountains Hydro-Electr. Authority, Cooma, NSW, Australia
  • fYear
    1989
  • fDate
    25-28 Sep 1989
  • Firstpage
    219
  • Lastpage
    224
  • Abstract
    The author describes the initial experiences of the Snowy Mountains Hydro-Electric Authority with Ontario Hydro partial discharge analyzer (PDA) technology. The factors necessitating modification of the standard XLPE (cross-linked polyethylene) cable coupler and its installation method are described. Some initial PDA test measurement results and their interpretation are presented. Comparisons are made between PDA and other discharge detector measurements. The significant improvement in the Authority´s knowledge of the condition of its generator stator windings as a result of initial PDA measurements is noted, and it is concluded that PDA condition monitoring will be an important tool in future maintenance strategic planning in the Snowy Mountains Scheme
  • Keywords
    charge measurement; hydroelectric generators; machine testing; partial discharges; stators; Ontario Hydro partial discharge analyzer; PDA; Snowy Mountains Scheme; cable coupler; condition monitoring; discharge detector measurements; generator stator windings; hydro generators; maintenance strategic planning; permanent capacitive couplers; Cable insulation; Couplers; Manufacturing; Partial discharge measurement; Partial discharges; Polymers; Power generation; Stator windings; Temperature; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Electronics Insulation Conference, 1989. Chicago '89 EEIC/ICWA Exposition., Proceedings of the 19th
  • Conference_Location
    Chicago, IL
  • Type

    conf

  • DOI
    10.1109/EEIC.1989.208229
  • Filename
    208229