• DocumentCode
    3118237
  • Title

    Jubilee line upgrade from Cross Acceptance to revenue service

  • Author

    Turner, S.D.

  • Author_Institution
    Stockton Eng. Manage. Ltd., UK
  • fYear
    2011
  • fDate
    20-22 Sept. 2011
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    This paper explains the process of safety acceptance applied to the Transmission Based Train Control (TBTC) System adopted by Tube Lines for the Jubilee and Northern Upgrade Project (JNUP).
  • Keywords
    railway industry; railway safety; JNUP; Jubilee and Northern Upgrade Project; TBTC; Tube Lines; revenue service; safety acceptance; transmission based train control system; Railway upgrade engineering safety management;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    System Safety, 2011 6th IET International Conference on
  • Conference_Location
    Birmingham
  • Type

    conf

  • DOI
    10.1049/cp.2011.0256
  • Filename
    6136921