DocumentCode :
3118237
Title :
Jubilee line upgrade from Cross Acceptance to revenue service
Author :
Turner, S.D.
Author_Institution :
Stockton Eng. Manage. Ltd., UK
fYear :
2011
fDate :
20-22 Sept. 2011
Firstpage :
1
Lastpage :
7
Abstract :
This paper explains the process of safety acceptance applied to the Transmission Based Train Control (TBTC) System adopted by Tube Lines for the Jubilee and Northern Upgrade Project (JNUP).
Keywords :
railway industry; railway safety; JNUP; Jubilee and Northern Upgrade Project; TBTC; Tube Lines; revenue service; safety acceptance; transmission based train control system; Railway upgrade engineering safety management;
fLanguage :
English
Publisher :
iet
Conference_Titel :
System Safety, 2011 6th IET International Conference on
Conference_Location :
Birmingham
Type :
conf
DOI :
10.1049/cp.2011.0256
Filename :
6136921
Link To Document :
بازگشت