DocumentCode :
3118641
Title :
Primary Practice of Green Mine Construction in Limestone Mine
Author :
Zhu Ming ; He Fang-wei ; Tang Rui ; Liu Tie-liang ; Wang Lian-hai
Author_Institution :
Key Lab. of Hebei Province, Hebei Polytech. Univ., Tangshan, China
fYear :
2010
fDate :
18-20 June 2010
Firstpage :
1
Lastpage :
4
Abstract :
Overall project of geologic environment comprehend- sive harnessing and landscape rehabilitation is put forward in production practice of Tangshan Sanyou Mine Corporation by using systems engineering process. Instructive research on building "Green Mine" demonstration plot in Hebei Province is realized in construction project which give attention to economic benefit of the mine and environmental factors. Linear programming is built for comprehensive utilization of waste rock in the orebody roof. And brief arts and crafts plan of waste dump ground reclamation is given.
Keywords :
construction; mining industry; waste; Hebei Province; Tangshan Sanyou Mine Corporation; economic benefit; environmental factors; green mine construction; landscape rehabilitation; limestone mine; linear programming; orebody roof; waste dump ground reclamation; waste rock; Chemical industry; Continuous improvement; Geology; Helium; Impurities; Linear programming; Magnesium compounds; Ores; Product safety; Production;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Bioinformatics and Biomedical Engineering (iCBBE), 2010 4th International Conference on
Conference_Location :
Chengdu
ISSN :
2151-7614
Print_ISBN :
978-1-4244-4712-1
Electronic_ISBN :
2151-7614
Type :
conf
DOI :
10.1109/ICBBE.2010.5516327
Filename :
5516327
Link To Document :
بازگشت