• DocumentCode
    3118720
  • Title

    Gas-Lift Allocation under Precedence Constraints: Piecewise-Linear Formulation and K-Covers

  • Author

    Camponogara, Eduardo ; De Conto, Augusto M.

  • Author_Institution
    Department of Automation and Systems, Federal University of Santa Catarina, P.O. Box 476, Florianópolis, SC 88040-900, Brazil (camponog@das.ufsc.br)
  • fYear
    2005
  • fDate
    12-15 Dec. 2005
  • Firstpage
    4422
  • Lastpage
    4427
  • Abstract
    Artificial lifting is a costly, but indispensable means to recover oil from high depth reservoirs. Continuous gas-lift works by injecting high pressure gas at the bottom of the production tubing to gasify the oil column, thereby forcing the flow of fluid to surface facilities. The problem consists in deciding which wells should produce and allocating a limited lift-gas rate to the active ones, subject to lower and upper bounds on gas injection, activation precedence constraints, and nonlinearities and discontinuities of the well performance curves. To this end, this paper develops a piecewise linear formulation of the lift-gas allocation problem that allows the application of powerful integer-programming algorithms. More specifically, it analyzes the constraint polyhedron of the piecewise linear formulation and extends cover inequalities of the knapsack polytope to the problem at hand.
  • Keywords
    Automation; Continuous production; Costs; Environmental economics; Hydrocarbon reservoirs; Linear programming; Petroleum; Piecewise linear techniques; Power generation economics; Upper bound;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control, 2005 and 2005 European Control Conference. CDC-ECC '05. 44th IEEE Conference on
  • Print_ISBN
    0-7803-9567-0
  • Type

    conf

  • DOI
    10.1109/CDC.2005.1582858
  • Filename
    1582858