• DocumentCode
    3132290
  • Title

    Estimating Design Costs for First-of-a-kind Projects

  • Author

    Banerjee, Bakul

  • Author_Institution
    Fermi Nat. Accel. Lab., Batavia
  • fYear
    2006
  • fDate
    17-20 Sept. 2006
  • Firstpage
    402
  • Lastpage
    405
  • Abstract
    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project.
  • Keywords
    costing; innovation management; project management; Fermilab; design costs estimation; first-of-a-kind projects; modem scientific facilities; project schedules; replicated project cost; Buildings; Collaboration; Costs; Educational institutions; Government; History; Laboratories; Project management; Scheduling; US Department of Energy;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering Management Conference, 2006 IEEE International
  • Conference_Location
    Bahia
  • Print_ISBN
    1-4244-0285-9
  • Electronic_ISBN
    1-4244-0286-7
  • Type

    conf

  • DOI
    10.1109/IEMC.2006.4279897
  • Filename
    4279897