DocumentCode
3138755
Title
Study on Framework of Construction Project Management Maturity Model
Author
Fengyong, Zhai ; Renhui, Liu
Author_Institution
Harbin Inst. of Technol., Harbin
fYear
2007
fDate
9-11 June 2007
Firstpage
1
Lastpage
5
Abstract
In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve ´process maturity´ of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.
Keywords
construction industry; project management; CPM3; PMMM; construction industry; construction project management maturity model; Buildings; Capability maturity model; Construction industry; Coordinate measuring machines; Current measurement; Job shop scheduling; Productivity; Project management; Technology management; assessment; construction project management maturity model (CPM3); improvement; questionnaire;
fLanguage
English
Publisher
ieee
Conference_Titel
Service Systems and Service Management, 2007 International Conference on
Conference_Location
Chengdu
Print_ISBN
1-4244-0885-7
Electronic_ISBN
1-4244-0885-7
Type
conf
DOI
10.1109/ICSSSM.2007.4280298
Filename
4280298
Link To Document