  • Abstract
    This paper presents an alternative method to improve the reliability of power distribution system against temporary ground fault by means of a recloser inserted between neutral point of substation power transformer and the grounding resistor. This recloser trips when there is ground fault at the feeder and reclose on a preset time delay. If the fault is sustaining, the grounding recloser will close permanently and the traditional overcurrent protection takes place. The field trial confirmed the effectiveness of the proposed method. The method is named as Ground Fault Path Clearing system or GFPC for short.
  • Keywords
    delays; earthing; overcurrent protection; power distribution faults; power distribution reliability; power transformers; substation protection; GFPC; feeder; grounding recloser; grounding resistor; neutral point; overcurrent protection; power distribution system reliability; recloser trips; substation power transformer; temporary ground fault path clearing system; time delay; Grounding; Interrupters; Power transformers; Production; Relays; Reliability; Substations; GFPC; grounding recloser; temporary ground fault;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering and Renewable Energy (ICPERE), 2012 International Conference on
  • Conference_Location
    Bali
  • Print_ISBN
    978-1-4673-2468-7
  • Electronic_ISBN
    978-1-4673-2469-4
  • Type

    conf

  • DOI
    10.1109/ICPERE.2012.6287220
  • Filename
    6287220