• DocumentCode
    3145544
  • Title

    Beam commissioning of the PEP-II High Energy Ring

  • Author

    Wienands, U. ; Anderson, S. ; Assmann, R. ; Bharadwaj, V. ; Cai, Y. ; Clendenin, J. ; Corredoura, P. ; Decker, F.J. ; Donald, M. ; Ecklund, S. ; Emma, P. ; Erickson, R. ; Fox, J. ; Fieguth, I. ; Fisher, Amnon ; Heifets, S. ; Hill, A. ; Himel, T. ; Iverson

  • Author_Institution
    Linear Accel. Lab., Stanford Univ., CA, USA
  • Volume
    5
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    2993
  • Abstract
    The PEP-II High Energy Ring (HER), a 9 GeV electron storage ring, has been in commissioning since spring 1997. Initial beam commissioning activities focused on systems checkout and commissioning and on determining the behaviour of the machine systems at high beam currents, This phase culminated with the accumulation of 0.75 A of stored beam-sufficient to achieve design luminosity-in January 1998 after 3.5 months of beam time. Collisions with the 3 GeV positron beam of the Low Energy Ring (LER) were achieved in Summer of 1998. At high beam currents, collective instabilities have been seen. Since then, commissioning activities for the HER have shifted in focus towards characterization of the machine and a rigorous program to understand the machine and the beam dynamics is presently underway
  • Keywords
    colliding beam accelerators; electron accelerators; particle beam dynamics; particle beam stability; storage rings; 9 GeV; PEP-II High Energy Ring; beam commissioning activities; beam dynamics; collective instabilities; electron storage ring; machine systems; systems checkout; Electrons; Energy storage; Linear accelerators; Magnets; Positrons; Springs; Tin;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1999. Proceedings of the 1999
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-5573-3
  • Type

    conf

  • DOI
    10.1109/PAC.1999.792123
  • Filename
    792123