DocumentCode
3145544
Title
Beam commissioning of the PEP-II High Energy Ring
Author
Wienands, U. ; Anderson, S. ; Assmann, R. ; Bharadwaj, V. ; Cai, Y. ; Clendenin, J. ; Corredoura, P. ; Decker, F.J. ; Donald, M. ; Ecklund, S. ; Emma, P. ; Erickson, R. ; Fox, J. ; Fieguth, I. ; Fisher, Amnon ; Heifets, S. ; Hill, A. ; Himel, T. ; Iverson
Author_Institution
Linear Accel. Lab., Stanford Univ., CA, USA
Volume
5
fYear
1999
fDate
1999
Firstpage
2993
Abstract
The PEP-II High Energy Ring (HER), a 9 GeV electron storage ring, has been in commissioning since spring 1997. Initial beam commissioning activities focused on systems checkout and commissioning and on determining the behaviour of the machine systems at high beam currents, This phase culminated with the accumulation of 0.75 A of stored beam-sufficient to achieve design luminosity-in January 1998 after 3.5 months of beam time. Collisions with the 3 GeV positron beam of the Low Energy Ring (LER) were achieved in Summer of 1998. At high beam currents, collective instabilities have been seen. Since then, commissioning activities for the HER have shifted in focus towards characterization of the machine and a rigorous program to understand the machine and the beam dynamics is presently underway
Keywords
colliding beam accelerators; electron accelerators; particle beam dynamics; particle beam stability; storage rings; 9 GeV; PEP-II High Energy Ring; beam commissioning activities; beam dynamics; collective instabilities; electron storage ring; machine systems; systems checkout; Electrons; Energy storage; Linear accelerators; Magnets; Positrons; Springs; Tin;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.792123
Filename
792123
Link To Document