DocumentCode
3147484
Title
Development of job-job step scheduler for NAL numerical simulator
Author
Hatayama, S. ; Tsuchiya, M. ; Shinkai, Y. ; Horishige, H.
Author_Institution
Nat. Aerosp. Lab., Tokyo, Japan
fYear
1988
fDate
14-18 Nov 1988
Firstpage
200
Lastpage
206
Abstract
The authors present the concepts and functions of the job-job step scheduler that is the kernel of the software packages developed for the management of the NAL numerical simulator (NS). This scheduler is partially responsible for the high operating ratio of supercomputers in NS, and there is some guarantee of job turnaround
Keywords
operating systems (computers); scheduling; NAL numerical simulator; job-job step scheduler; management; software packages; supercomputers; Hardware; Job design; Kernel; Numerical simulation; Operating systems; Processor scheduling; Solid state circuits; Supercomputers;
fLanguage
English
Publisher
ieee
Conference_Titel
Supercomputing '88. [Vol.1]., Proceedings.
Conference_Location
Orlando, FL
Print_ISBN
0-8186-0882-X
Type
conf
DOI
10.1109/SUPERC.1988.44654
Filename
44654
Link To Document