DocumentCode :
3147484
Title :
Development of job-job step scheduler for NAL numerical simulator
Author :
Hatayama, S. ; Tsuchiya, M. ; Shinkai, Y. ; Horishige, H.
Author_Institution :
Nat. Aerosp. Lab., Tokyo, Japan
fYear :
1988
fDate :
14-18 Nov 1988
Firstpage :
200
Lastpage :
206
Abstract :
The authors present the concepts and functions of the job-job step scheduler that is the kernel of the software packages developed for the management of the NAL numerical simulator (NS). This scheduler is partially responsible for the high operating ratio of supercomputers in NS, and there is some guarantee of job turnaround
Keywords :
operating systems (computers); scheduling; NAL numerical simulator; job-job step scheduler; management; software packages; supercomputers; Hardware; Job design; Kernel; Numerical simulation; Operating systems; Processor scheduling; Solid state circuits; Supercomputers;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Supercomputing '88. [Vol.1]., Proceedings.
Conference_Location :
Orlando, FL
Print_ISBN :
0-8186-0882-X
Type :
conf
DOI :
10.1109/SUPERC.1988.44654
Filename :
44654
Link To Document :
بازگشت