• DocumentCode
    3147975
  • Title

    Simulation of Flow Field in Pre-Dams and Phosphorus Elimination during Rainstorm

  • Author

    Li Bin ; Lu Xiwu ; Ning Ping

  • Author_Institution
    Dept. of Environ. Eng., Southeast Univ., Nanjing, China
  • fYear
    2010
  • fDate
    18-20 June 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Numerical simulation was established and validated by the course of the rainstorm following 25 hours, which shows that the flow field can help to make the water in pre-dam effuse and prevent the Dianchi Lake water from recharging. Soluble reactive phosphorus (SRP) elimination was calculated along the whole rainfall. The result shows that the simulation is identical to the calculated and is able to account for SRP removal. SRP removal efficiency is over percent forty eight in despite of rainstorm and so the pre-dam technique may be a rewarding choice for non point pollution control, especially for hypereutrophic lakes and reservoirs.
  • Keywords
    dams; flow simulation; lakes; phosphorus; rain; reservoirs; Dianchi Lake water; flow field simulation; hypereutrophic lakes; nonpoint pollution control; numerical simulation; phosphorus elimination; pre-dams; rainstorm; reservoirs; time 25 h; Absorption; Lakes; Mathematical model; Numerical simulation; Pollution control; Reservoirs; Rivers; Transportation; Water pollution; Water resources;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Bioinformatics and Biomedical Engineering (iCBBE), 2010 4th International Conference on
  • Conference_Location
    Chengdu
  • ISSN
    2151-7614
  • Print_ISBN
    978-1-4244-4712-1
  • Electronic_ISBN
    2151-7614
  • Type

    conf

  • DOI
    10.1109/ICBBE.2010.5517834
  • Filename
    5517834