• DocumentCode
    3149163
  • Title

    Development of the X-band RF power source for JLC

  • Author

    Chin, Y.H. ; Akemoto, M. ; Fukuda, S. ; Matsumoto, S. ; Michizono, S. ; Mizuno, H. ; Takata, K. ; Toge, N. ; Tokumoto, S. ; Tsutsui, H. ; Yamaguchi, S. ; Wang, J. ; Kazakov, S.

  • Author_Institution
    KEK, Tsukuba, Japan
  • Volume
    5
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    3414
  • Abstract
    In this paper, we summarize our activities on X-band RF power source development for the Japan Linear Collider (JLC) project. First, we have designed and tested a solenoid-focused klystron at 11.424 GHz with a pulse length of 1.5 μs and with an efficiency of 47%. A periodic permanent magnet (PPM) klystron, the first in that kind at KEK, is also under development. In parallel to this activity, another PPM klystron has been developed and remodeled in collaboration with BINP. Second, a new RF window with 100-MW power-handling capability has been designed and tested. It utilizes the TW mixed mode (TE11 and TM11 modes) to reduce the surface field at the brazing edge of the ceramic. The cold model test shows a low electric field at the brazing point as predicted by HFSS calculations. The high power model is now in manufacturing and the testing will start soon. Third, the Blumlein modulator was upgraded to produce a pulse with 2 μs flat top and 200 ns rise time at 550 kV output voltage. Fourth, the multi-mode 2×2 DLDS (Delay Line Distribution System) pulse compression system has been designed, and its basic unit was manufactured and tested for proof of the principle. The measurement results show that the system works well with a high power distribution efficiency. The so-called mode stability experiment is also under preparation in the ATF linac tunnel in collaboration with SLAC. This experiment is aimed for examination of the stability of linearly polarized TE12 mode in a 55 m long waveguide, a key issue in the present configuration of multi-mode DLDS. Details of these developments and measurement results are presented
  • Keywords
    accelerator RF systems; electron accelerators; klystrons; linear colliders; 11.424 GHz; 550 kV; Blumlein modulator; Delay Line Distribution System pulse compression system; JLC; Japan Linear Collider; X-band RF power source; cold model test; high power model; linearly polarized TE12 mode; mode stability experiment; periodic permanent magnet klystron; power-handling capability; solenoid-focused klystron; Ceramics; Collaboration; Klystrons; Permanent magnets; Power system modeling; Predictive models; Pulse modulation; Radio frequency; Stability; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1999. Proceedings of the 1999
  • Conference_Location
    New York, NY
  • Print_ISBN
    0-7803-5573-3
  • Type

    conf

  • DOI
    10.1109/PAC.1999.792321
  • Filename
    792321