Title :
Biopower Generation in British Columbia: An Opportunity for Greenhouse Gas Mitigation
Author :
Kumar, Amit ; Flynn, Peter ; Sokhansanj, Shahab
Author_Institution :
Dept. of Mech. Eng., Univ. of Alberta, Edmonton, AB
Abstract :
Biomass is considered carbon neutral, and replacement of fossil fuel based power by biomass based power could significantly help mitigate greenhouse gases. Large areas of forests in British Columbia (B.C.) are being infested by the mountain pine beetle (MPB). Dead wood from MPB infestation of B.C.\´s forest is expected to vastly exceed the ability of the pulp and lumber industry to utilize it; current estimates are that 200 to 600 million cu. m of wood will remain unharvested over the next 20 years. Regions where the damaged wood is not harvested will experience loss of jobs in the forestry sector, increased risk of forest fire hazard, carbon emissions from burned or decaying wood, and uncertainty about timing of replanting since this usually occurs at harvest. This paper report the results of a detailed preliminary techno-economic analysis of producing power from MPB killed wood. Power plant size and location are critical factors affecting overall power cost. Overall cost of power rises steeply at sizes below 300 MW net power output. By locating the power plant in an area of high infestation, transportation distances can be minimized. A 300 MW power plant would consume 64 million cu. m of wood over a 20 year lifetime, and hence is a significant sink for otherwise unharvestable wood. Cost estimates are based on harvesting of whole dead trees with roadside chipping and transport to a central power plant located in either the Nazko or Quesnel regions of B.C. A circulating fluidized bed boiler with a conventional steam cycle is a currently available technology demonstrated in Finland. The estimated power cost is $68 to $74 per MWh, which is competitive with other "green power" values in B.C. Given recent values of export power in the Pacific Northwest, a 300 MW MPB power plant can compete with a carbon credit below $15 per tonne of CO2.
Keywords :
air pollution control; bioenergy conversion; greenhouses; power stations; British Columbia; biomass; biopower generation; fossil fuel; greenhouse gas mitigation; techno-economic analysis; Biomass; Carbon dioxide; Costs; Fires; Forestry; Fossil fuels; Global warming; Hazards; Power generation; Wood industry; Biomass power; Direct combustion; Lodgepole pine; Mountain pine beetle; Power cost;
Conference_Titel :
EIC Climate Change Technology, 2006 IEEE
Conference_Location :
Ottawa, ON
Print_ISBN :
1-4244-0218-2
Electronic_ISBN :
1-4244-0218-2
DOI :
10.1109/EICCCC.2006.277181