• DocumentCode
    3151049
  • Title

    Rescheduling a permutation flowshop problems under the arrival a new set of jobs

  • Author

    Ben Itayef, A. ; Loukil, Taicir ; Teghem, J.

  • Author_Institution
    Fac. des Sci. Economiques, Univ. de Sfax, Sfax, Tunisia
  • fYear
    2009
  • fDate
    6-9 July 2009
  • Firstpage
    188
  • Lastpage
    192
  • Abstract
    A set of jobs has been scheduled on a machine flowhop, but not yet processed, when a set of new jobs arrives. The problem of shop rescheduling on occurrence of an unforeseen disruption is addressed here. The decision maker needs to insert the new jobs into the existing schedule without excessively changing it. The practical solution requires satisfaction of two often conflicting goals. We propose a method to heuristically obtain a satisfying production schedule. The procedure involves two stages. In a first step, given a fixed order of jobs a conventional heuristic is proposed to successively assign the jobs to the machines. In a second one. the simulated annealing is applied to optimise the order of the jobs.
  • Keywords
    flow shop scheduling; manufacturing systems; simulated annealing; conventional heuristic; machine flowhop; permutation flowshop problem; shop rescheduling; simulated annealing; Costs; Decision making; Dynamic scheduling; Job shop scheduling; Modems; Production systems; Simulated annealing; Single machine scheduling; Terrorism; Time measurement; bi-objective optimization; flowshop; rescheduling; simulated annealing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computers & Industrial Engineering, 2009. CIE 2009. International Conference on
  • Conference_Location
    Troyes
  • Print_ISBN
    978-1-4244-4135-8
  • Electronic_ISBN
    978-1-4244-4136-5
  • Type

    conf

  • DOI
    10.1109/ICCIE.2009.5223568
  • Filename
    5223568