DocumentCode
3152591
Title
In circuit test (ICT): The king is dead; long live the king!
Author
Balangue, Bailarico
Author_Institution
Agilent
fYear
2011
fDate
20-22 Sept. 2011
Firstpage
1
Lastpage
1
Abstract
The objective of the panel is to have a good honest discussion from the board test industry experts about the future of ICT. The panel will consist of experts from various part of the industry and group them according to the following: 1. Board Test Managers/Experts from the Original Equipment Manufacturing (OEM), Contract Manufacturing (CM) and Original Design Manufacturing (ODM) side who strongly believe that the current ICT system is insufficient to test the new generation of PCBA. 2. ICT Marketing Manager/experts from ICT supplier (Agilent/Teradyne/TRI) that believes that the current ICT system has enough capabilities and features to maintain test coverage and cost needs for new generation of PCBA. 3. Board test Managers/Expert at OEM/CM/ODM who are dependent on ICT system as their main board test manufacturing strategy and has invested substantial ICT equipment and infrastructure in their manufacturing.
fLanguage
English
Publisher
ieee
Conference_Titel
Test Conference (ITC), 2011 IEEE International
Conference_Location
Anaheim, CA, USA
ISSN
1089-3539
Print_ISBN
978-1-4577-0153-5
Type
conf
DOI
10.1109/TEST.2011.6139194
Filename
6139194
Link To Document