• DocumentCode
    3154148
  • Title

    Computing the supplementary times and the number of required trains in operation plan studies under stochastic perturbations

  • Author

    Jamili, A. ; Ghannadpour, S.F.

  • Author_Institution
    Dept. of Railway Transp., MAPNA Group, Tehran, Iran
  • fYear
    2013
  • fDate
    6-9 Oct. 2013
  • Firstpage
    1340
  • Lastpage
    1345
  • Abstract
    In the urban railway systems, the perturbations during passing stations and block sections as well as shunting operations result in some delays for trains and in the case that the delays are not absorbed by the assigned buffer intervals, and supplementary times, the delays could be propagated in the system. In this paper the methods to compute the delays are reviewed and applied in urban railway systems, An algorithm to compute the required buffer intervals based on the headway, and the required supplementary times to reach a safe and reliable system is presented. Moreover, the relation between supplementary times, perturbations, and the number of required trains to reach the advised headway, are discussed. Finally, the Karaj Metro Line 2 is considered and analyzed as the case study.
  • Keywords
    delays; railways; Karaj Metro Line 2; block sections; operation plan studies; passing stations; stochastic perturbations; supplementary times; urban railway systems; Communication system signaling; Delays; Distribution functions; Rail transportation; Robustness; Schedules;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Transportation Systems - (ITSC), 2013 16th International IEEE Conference on
  • Conference_Location
    The Hague
  • Type

    conf

  • DOI
    10.1109/ITSC.2013.6728417
  • Filename
    6728417