DocumentCode
3154148
Title
Computing the supplementary times and the number of required trains in operation plan studies under stochastic perturbations
Author
Jamili, A. ; Ghannadpour, S.F.
Author_Institution
Dept. of Railway Transp., MAPNA Group, Tehran, Iran
fYear
2013
fDate
6-9 Oct. 2013
Firstpage
1340
Lastpage
1345
Abstract
In the urban railway systems, the perturbations during passing stations and block sections as well as shunting operations result in some delays for trains and in the case that the delays are not absorbed by the assigned buffer intervals, and supplementary times, the delays could be propagated in the system. In this paper the methods to compute the delays are reviewed and applied in urban railway systems, An algorithm to compute the required buffer intervals based on the headway, and the required supplementary times to reach a safe and reliable system is presented. Moreover, the relation between supplementary times, perturbations, and the number of required trains to reach the advised headway, are discussed. Finally, the Karaj Metro Line 2 is considered and analyzed as the case study.
Keywords
delays; railways; Karaj Metro Line 2; block sections; operation plan studies; passing stations; stochastic perturbations; supplementary times; urban railway systems; Communication system signaling; Delays; Distribution functions; Rail transportation; Robustness; Schedules;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Transportation Systems - (ITSC), 2013 16th International IEEE Conference on
Conference_Location
The Hague
Type
conf
DOI
10.1109/ITSC.2013.6728417
Filename
6728417
Link To Document