DocumentCode
3155786
Title
Notice of Retraction
The method of determining dynamic comprehensive evaluation
Author
Zhongying Lei ; Shoude Yan ; Xiaodi Tan
Author_Institution
Sch. of Urban Constr., Yangtze Univ., Jingzhou, China
fYear
2011
fDate
8-10 Aug. 2011
Firstpage
6453
Lastpage
6456
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
For construction projects with long period, it is not enough to only assess it´s final effect for construction companies, but sometimes need to longitudinally evaluate the same item on the operating conditions and effects at different time, which requires the research on dynamic comprehensive evaluation of the project management effect. The core issue of the dynamic comprehensive evaluation is to determine the weight vector. This paper mainly adopts the technique of “longitudinal” scatter with principle of different driving, to calculate the weight of project evaluation vecter in dynamic comprehensive evaluation during different time.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
For construction projects with long period, it is not enough to only assess it´s final effect for construction companies, but sometimes need to longitudinally evaluate the same item on the operating conditions and effects at different time, which requires the research on dynamic comprehensive evaluation of the project management effect. The core issue of the dynamic comprehensive evaluation is to determine the weight vector. This paper mainly adopts the technique of “longitudinal” scatter with principle of different driving, to calculate the weight of project evaluation vecter in dynamic comprehensive evaluation during different time.
Keywords
construction; construction industry; project management; construction company; construction projects; dynamic comprehensive evaluation; longitudinal scatter; operating condition; project evaluation; project management effect; weight vector; Equations; Indexes; Mathematical model; Project management; Standardization; Symmetric matrices; Time series analysis; Weight; dynamic comprehensive evaluation; management effectiveness;
fLanguage
English
Publisher
ieee
Conference_Titel
Artificial Intelligence, Management Science and Electronic Commerce (AIMSEC), 2011 2nd International Conference on
Conference_Location
Dengleng
Print_ISBN
978-1-4577-0535-9
Type
conf
DOI
10.1109/AIMSEC.2011.6009639
Filename
6009639
Link To Document