DocumentCode :
3156051
Title :
Project scheduling under resource constraints: Application of the cumulative global constraint
Author :
Trojet, Mariem ; Mida, Fehmi H. ; Lopez, Pierre
Author_Institution :
UR MSSDT ESSTT, Tunis, Tunisia
fYear :
2009
fDate :
6-9 July 2009
Firstpage :
62
Lastpage :
67
Abstract :
This paper concerns project scheduling under resource constraints. The objective is to find a solution that minimizes the project makespan, while respecting the precedence constraints and the resource constraints. The problem under consideration is modelled as a constraint satisfaction problem (CSP). It is implemented under the constraint programming language CHIP V5. For modelling the resource constraints, we are particularly interested in the application of the cumulative global constraint. The provided solutions determine values for the various variables associated to the tasks realized on each resource, as well as the curves with the profile of the total consumption of resources on time.
Keywords :
constraint handling; constraint theory; scheduling; CHIP V5 language; constraint programming language; constraint satisfaction problem; cumulative global constraint; precedence constraint; production scheduling; project makespan; project scheduling; resource constraint; Artificial intelligence; Computer languages; Filtering algorithms; Graph theory; Indium phosphide; Linear programming; Mathematical programming; Optimization methods; Production; Uninterruptible power systems; Production scheduling; constraint programming; constraint satisfaction problem; cumulative global constraint;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computers & Industrial Engineering, 2009. CIE 2009. International Conference on
Conference_Location :
Troyes
Print_ISBN :
978-1-4244-4135-8
Electronic_ISBN :
978-1-4244-4136-5
Type :
conf
DOI :
10.1109/ICCIE.2009.5223894
Filename :
5223894
Link To Document :
بازگشت