DocumentCode
3157889
Title
A chronological model for reliability calculation in an electric generation system and its importance in long term system planning
Author
Bianu, A. ; Frant, S.
Author_Institution
R&D Div., Israel Electric Corp., Haifa, Israel
fYear
1991
fDate
5-7 Mar 1991
Firstpage
215
Lastpage
218
Abstract
This paper describes a more accurate computer model of the system based on a chronological procedure. Results of the model are presented for a case study based on the Israeli electric generation system data. A comparison with results of reliability of supply indices calculated by sophisticated models used for long term generation system planning is also analyzed
Keywords
electric power generation; power system analysis computing; power system planning; power system reliability; Israeli electric generation system; chronological model; computer model; long term generation system planning; Analytical models; Capacity planning; Cities and towns; Cost function; Performance evaluation; Power generation; Power system modeling; Power system reliability; Probability; Production;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical and Electronics Engineers in Israel, 1991. Proceedings., 17th Convention of
Conference_Location
Tel Aviv
Print_ISBN
0-87942-678-0
Type
conf
DOI
10.1109/EEIS.1991.217660
Filename
217660
Link To Document