• DocumentCode
    3159411
  • Title

    An extention of edge zeroing heuristic for scheduling precedence constrained task graphs on parallel systems using cluster dependent priority scheme

  • Author

    Mishra, Abhishek ; Tripathi, Anil Kumar

  • Author_Institution
    Dept. of Comput. Eng., Banaras Hindu Univ., Varanasi, India
  • fYear
    2010
  • fDate
    17-19 Sept. 2010
  • Firstpage
    647
  • Lastpage
    651
  • Abstract
    Sarkar´s edge zeroing heuristic for scheduling precedence constrained task graphs on parallel systems can be viewed as a priority based algorithm in which the priority is assigned to edges. In this algorithm, the priority is taken as the edge weight. This can also be viewed as a module dependent priority function that is defined for pairs of modules. We have extended this idea in which the priority is a cluster dependent function of pairs of clusters (of modules). Using this idea we propose an algorithm of complexity O(|V||E|(|V|+|E|)) and compare it with some well known algorithms.
  • Keywords
    computational complexity; parallel processing; scheduling; Sarkar edge zeroing heuristic; cluster dependent priority scheme; complexity algorithm; constrained task graph scheduling; parallel systems; scheduling precedence; Clustering algorithms; Complexity theory; Program processors; Scheduling; Scheduling algorithm; clustering; homogeneous systems; parallel processing; scheduling; task allocation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer and Communication Technology (ICCCT), 2010 International Conference on
  • Conference_Location
    Allahabad, Uttar Pradesh
  • Print_ISBN
    978-1-4244-9033-2
  • Type

    conf

  • DOI
    10.1109/ICCCT.2010.5640450
  • Filename
    5640450