DocumentCode
3173495
Title
Beta site testing of the 20C12000 flywheel energy storage system
Author
Stanton, William E. ; Saliba, Joseph R. ; Piela, Stephen T.
Author_Institution
Beacon Power Corp., Woburn, MA, USA
fYear
1999
fDate
36312
Abstract
Beacon Power Corporation is developing Telecom/Cable flywheel energy systems for standby power supply applications. This paper describes Beacon´s early field test experience with its 2 kWh system which has been in field trials since September 1998. Also described are field installation methods, remote system monitoring and control, factory test procedures and experience
Keywords
emergency power supply; flywheels; monitoring; telecontrol; testing; 2 kWh; 20C12000 flywheel energy storage; Beacon Power Corporation; Telecom/Cable flywheel energy systems; beta site testing; factory test procedures; field installation methods; field test experience; remote system control; remote system monitoring; standby power supply applications; Energy storage; Flywheels; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunication Energy Conference, 1999. INTELEC '99. The 21st International
Conference_Location
Copenhagen
Print_ISBN
0-7803-5624-1
Type
conf
DOI
10.1109/INTLEC.1999.794131
Filename
794131
Link To Document