• DocumentCode
    3180052
  • Title

    An algorithm for the scheduling of setups and production to meet due dates

  • Author

    Burman, Mitchell H. ; Gershwin, Stanley B.

  • Author_Institution
    Lab. for Manuf. & Productivity., MIT, Cambridge, MA, USA
  • fYear
    1992
  • fDate
    12-14 May 1992
  • Firstpage
    1150
  • Abstract
    A closed-loop production control algorithm for a medical device manufacturing facility of an international healthcare conglomerate with due dates, significant setup times, and random disruptions is proposed. The algorithm is problem driven, exploits a hierarchical setup structure, and uses real-time control. The algorithm has been reduced to a set of simplistic rules with which floor management feels comfortable. The purpose of this research is to provide the theoretical underpinnings of those simple rules
  • Keywords
    biomedical equipment; closed loop systems; production control; scheduling; closed-loop production control algorithm; due dates; floor management; hierarchical setup structure; medical device manufacturing facility; problem-driven algorithm; production scheduling; random disruptions; real-time control; setup scheduling; setup times; Control systems; Costs; Job shop scheduling; Laboratories; Manufacturing; Medical services; Production control; Production facilities; Productivity; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on
  • Conference_Location
    Nice
  • Print_ISBN
    0-8186-2720-4
  • Type

    conf

  • DOI
    10.1109/ROBOT.1992.220193
  • Filename
    220193