• DocumentCode
    3182688
  • Title

    The use of threshold logic to improve performance in scheduling a manufacturing process

  • Author

    Farley, Earl T. ; Haworth, Dwight A.

  • Author_Institution
    Texas Tech Univ., Lubbock, TX, USA
  • fYear
    1988
  • fDate
    21-23 March 1988
  • Firstpage
    11
  • Lastpage
    14
  • Abstract
    Simulation and threshold logic are used to demonstrate the feasibility of a learning system that increases production output. Production is simulated with a discrete, next-event model having multiple paths and multiple processes on each path. Switches located throughout the model can direct production units to avoid bottlenecks and improve output. Each switch in the model is controlled by the action of threshold gates. For the process time configurations tested, minima were found to be associated with one or more of three threshold values set in 92% of the configurations. Using the three threshold value sets and a rule base for process time configurations that are not optimized by one of the three sets, a system may be created that avoids the computational costs and time delays of a multiple-trial optimizing system.<>
  • Keywords
    learning systems; manufacturing processes; scheduling; threshold logic; learning system; manufacturing process; multiple paths; multiple processes; multiple-trial optimizing system; next-event model; production output increase; scheduling; threshold gates; threshold logic; time delays; Computational efficiency; Delay effects; Job shop scheduling; Logic; Manufacturing processes; Neck; Production systems; Switches; Testing; Time factors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    IEEE Region 5 Conference, 1988: 'Spanning the Peaks of Electrotechnology'
  • Conference_Location
    Colorado Springs, CO, USA
  • Type

    conf

  • DOI
    10.1109/REG5.1988.15890
  • Filename
    15890