DocumentCode :
3183755
Title :
Integration and testing challenges of IEC 61850 multivendor protection schemes
Author :
Rene, Aguilar ; James, Ashish
fYear :
2010
fDate :
March 29 2010-April 1 2010
Firstpage :
1
Lastpage :
5
Abstract :
A major challenge facing utilities today is the successful configuration and testing of multi-vendor protection schemes using the EC 61850 standard. Even though the EC 61850 standard allows for interoperability between different manufacturers´ relays, the implementation of the communication protocol varies greatly from vendor to vendor. The standard does not mention how the ED should be configured and each vendor is left to provide their own proprietary methods. This paper will discuss the pitfalls in the engineering process, configuration, and testing of multivendor ED´s using a distributed communications assisted breaker failure scheme as an example.
Keywords :
protocols; relay protection; IEC 61850 standard; IED; communication protocol; manufacturer relays; multivendor protection schemes; pitfalls; GOOSE; IEC 61850; Interoperability; SCL Files;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Developments in Power System Protection (DPSP 2010). Managing the Change, 10th IET International Conference on
Conference_Location :
Manchester
Type :
conf
DOI :
10.1049/cp.2010.0235