• DocumentCode
    3190705
  • Title

    Intelligentized work-preparation for ship hull construction with Optimized Assembly Planning System

  • Author

    Chi, Zhou ; Jun, Sun

  • Author_Institution
    Sch. of Naval Archit., Shanghai Jiaotong Univ., Shanghai, China
  • fYear
    2010
  • fDate
    10-13 Oct. 2010
  • Firstpage
    2740
  • Lastpage
    2744
  • Abstract
    Efficiency of work-preparation influences greatly to the delivery time of shipbuilding. Many current commercial softwares are able to generate 3D topological ship construction model. However, little study has been made on utilizing the added value of those models. This paper focuses on introducing Productivity Extension Module (PEM) as a secondary development of software based on AutoCAD platform. PEM is able to effectively generate 3D topological ship construction model with Optimized Assembly Planning System. Benchmark based on a real engineering project is provided by this paper in order to prove the efficiency of PEM. It is concluded that PEM is in high efficiency when dealing with construction modeling and making workshop assembly plan for shipbuilding.
  • Keywords
    CAD; assembly planning; construction; production engineering computing; productivity; shipbuilding industry; 3D topological ship construction model; AutoCAD platform; commercial softwares; intelligent work-preparation; optimized assembly planning system; productivity extension module; ship hull construction; shipbuilding; Artificial intelligence; Assembly; Computational modeling; Manuals; Numerical models; Solid modeling; Three dimensional displays; ERP; Expert Syetem; shipbuilding work-preparation; topological 3D model;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems Man and Cybernetics (SMC), 2010 IEEE International Conference on
  • Conference_Location
    Istanbul
  • ISSN
    1062-922X
  • Print_ISBN
    978-1-4244-6586-6
  • Type

    conf

  • DOI
    10.1109/ICSMC.2010.5642509
  • Filename
    5642509