DocumentCode
3196036
Title
CEBAF Control Room Renovation
Author
Spata, M. ; Oren, T. ; Cuffe, A. ; Fanning, H.
Author_Institution
Jefferson Lab, Newport News, VA 23606, USA
fYear
2005
fDate
16-20 May 2005
Firstpage
378
Lastpage
381
Abstract
The Machine Control Center (MCC) at Jefferson Lab´s Continuous Electron Beam Accelerator Facility (CEBAF) was initially constructed in the early 1990s and based on proven technology of that era. Through our experience over the last 15 years and in our planning for the facility’s 12 GeV upgrade we reevaluated the control room environment to capitalize on emerging visualization and display technologies and improve workflow processes and ergonomic attributes. This effort also sets the foundation for the redevelopment of the accelerator´s control system to deliver high reliability performance with improvements in beam specifications management and information flow. The complete renovation was performed over a three-week maintenance period with no interruption to beam operations. We present the results of this effort.
Keywords
Acceleration; Control systems; Displays; Electron accelerators; Electron beams; Ergonomics; Machine control; Process planning; Technology planning; Visualization;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590440
Filename
1590440
Link To Document