DocumentCode
3196877
Title
Commissioning of Fermilab´s Electron Cooling System for 8-GeV Antiprotons
Author
Nagaitsev, S. ; Broemmelsiek, D. ; Burov, A. ; Carlson, K. ; Gattuso, C. ; Hu, M. ; Kramper, B. ; Kroc, T. ; Leibfritz, J. ; Prost, L. ; Pruss, S. ; Saewert, G. ; Schmidt, C.W. ; Shemyakin, A. ; Sutherland, M. ; Tupikov, V. ; Warner, A. ; Seletsky, S. ; G
Author_Institution
FNAL, Batavia, IL 60134, U.S.A., nsergei@fnal.gov
fYear
2005
fDate
16-20 May 2005
Firstpage
540
Lastpage
543
Abstract
A 4.3-MeV electron cooling system [1] has been installed at Fermilab in the Recycler antiproton storage ring and is currently being commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper reports on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons.
Keywords
Cooling; Electron beams; Electron emission; Indium phosphide; Particle beams; Prototypes; Stacking; Stochastic processes; Storage rings; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590489
Filename
1590489
Link To Document