• DocumentCode
    3196877
  • Title

    Commissioning of Fermilab´s Electron Cooling System for 8-GeV Antiprotons

  • Author

    Nagaitsev, S. ; Broemmelsiek, D. ; Burov, A. ; Carlson, K. ; Gattuso, C. ; Hu, M. ; Kramper, B. ; Kroc, T. ; Leibfritz, J. ; Prost, L. ; Pruss, S. ; Saewert, G. ; Schmidt, C.W. ; Shemyakin, A. ; Sutherland, M. ; Tupikov, V. ; Warner, A. ; Seletsky, S. ; G

  • Author_Institution
    FNAL, Batavia, IL 60134, U.S.A., nsergei@fnal.gov
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    540
  • Lastpage
    543
  • Abstract
    A 4.3-MeV electron cooling system [1] has been installed at Fermilab in the Recycler antiproton storage ring and is currently being commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper reports on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons.
  • Keywords
    Cooling; Electron beams; Electron emission; Indium phosphide; Particle beams; Prototypes; Stacking; Stochastic processes; Storage rings; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1590489
  • Filename
    1590489