DocumentCode :
3197962
Title :
Optimal production control in pull flow lines with multiple part types: a summary
Author :
Yang, Jun ; Yan, Houmin ; Sethi, Suresh P.
Author_Institution :
Dept. of Syst. Eng., Chinese Univ. of Hong Kong, Shatin, Hong Kong
Volume :
4
fYear :
1996
fDate :
11-13 Dec 1996
Firstpage :
3847
Abstract :
The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and its computational complexity
Keywords :
computational complexity; minimisation; optimal control; production control; backlog cost minimization; bottleneck; computational complexity; multiple part types; optimal production control problem; pull flow lines; total inventory minimization; Computational complexity; Costs; Dynamic scheduling; Electric breakdown; Fluid dynamics; Linear programming; Production control; Production systems; Steady-state; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Decision and Control, 1996., Proceedings of the 35th IEEE Conference on
Conference_Location :
Kobe
ISSN :
0191-2216
Print_ISBN :
0-7803-3590-2
Type :
conf
DOI :
10.1109/CDC.1996.577259
Filename :
577259
Link To Document :
بازگشت