• DocumentCode
    3198118
  • Title

    Schedule revision in a distributed job shop with the makespan objective

  • Author

    Tsukada, Thomas ; Shin, Kang G.

  • Author_Institution
    Dept. of Electr. Eng. & Comput. Sci., Michigan Univ., Ann Arbor, MI, USA
  • Volume
    2
  • fYear
    1997
  • fDate
    20-25 Apr 1997
  • Firstpage
    957
  • Abstract
    This paper examines the problem of schedule revision in a distributed job shop where the object is to minimize the global makespan. Schedules of work cells may interact through precedence constraints, and a work cell´s response to a local schedule disruption may affect schedules of other cells. Complete knowledge about how local schedule changes affect the global schedule may require global knowledge about the schedule. Here, we show that knowledge of only local constraints may be almost as useful as global knowledge for the revision of one cell´s schedule. We present simulation results from a general distributed job shop model
  • Keywords
    minimisation; production control; distributed job shop; global makespan minimization; local schedule disruption; makespan objective; precedence constraints; schedule revision; Computational modeling; Computer integrated manufacturing; Distributed computing; Electrical capacitance tomography; Flexible manufacturing systems; Job shop scheduling; Laboratories; Manufacturing systems; Problem-solving; Processor scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1997. Proceedings., 1997 IEEE International Conference on
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    0-7803-3612-7
  • Type

    conf

  • DOI
    10.1109/ROBOT.1997.614258
  • Filename
    614258