DocumentCode
3198118
Title
Schedule revision in a distributed job shop with the makespan objective
Author
Tsukada, Thomas ; Shin, Kang G.
Author_Institution
Dept. of Electr. Eng. & Comput. Sci., Michigan Univ., Ann Arbor, MI, USA
Volume
2
fYear
1997
fDate
20-25 Apr 1997
Firstpage
957
Abstract
This paper examines the problem of schedule revision in a distributed job shop where the object is to minimize the global makespan. Schedules of work cells may interact through precedence constraints, and a work cell´s response to a local schedule disruption may affect schedules of other cells. Complete knowledge about how local schedule changes affect the global schedule may require global knowledge about the schedule. Here, we show that knowledge of only local constraints may be almost as useful as global knowledge for the revision of one cell´s schedule. We present simulation results from a general distributed job shop model
Keywords
minimisation; production control; distributed job shop; global makespan minimization; local schedule disruption; makespan objective; precedence constraints; schedule revision; Computational modeling; Computer integrated manufacturing; Distributed computing; Electrical capacitance tomography; Flexible manufacturing systems; Job shop scheduling; Laboratories; Manufacturing systems; Problem-solving; Processor scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation, 1997. Proceedings., 1997 IEEE International Conference on
Conference_Location
Albuquerque, NM
Print_ISBN
0-7803-3612-7
Type
conf
DOI
10.1109/ROBOT.1997.614258
Filename
614258
Link To Document