DocumentCode :
3198141
Title :
Commissioning and First Measurements on the CTF3 Chicane
Author :
Ghigo, A. ; Alesini, D. ; Benedetti, G. ; Biscari, C. ; Castellano, M. ; Drago, A. ; Filippetto, D. ; Marcellini, F. ; Milardi, C. ; Preger, B. ; Serio, M. ; Sgamma, M. ; Stella, A. ; Zobov, M. ; Corsini, R. ; Lefevre, T. ; Tecker, F.
Author_Institution :
INFN/LNF, Frascati (Roma)
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
785
Lastpage :
787
Abstract :
The transfer line between the linac and the first recombination ring (Delay Loop) of the CTF3 project has been installed at CERN in spring-summer 2004. In the transfer line a magnetic chicane is used to tune the length of the bunches coming from the linac in order to minimize the Coherent Synchrotron Radiation contribution to the beam energy spread in the recombination system. The first measurements of the beam parameters at several linac and stretcher settings are described. We report the compression curve as a function of the optical parameter R56representing the dependence of the longitudinal position of a particle on its energy, obtained by measuring the bunch length with a 3 GHz RF deflector.
Keywords :
Colliding beam devices; Energy measurement; Length measurement; Linear particle accelerator; Magnets; Monitoring; Particle beams; Radio frequency; Structural beams; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1590563
Filename :
1590563
Link To Document :
بازگشت