DocumentCode :
3202035
Title :
Energy Deposition Studies for the Betatron Cleaning Insertion (IR7) of LHC
Author :
Santana-Leitner, M. ; Assmann, R. ; Ferrari, A. ; Magistris, M. ; Tsoulou, E. ; Vlachoudis, V.
Author_Institution :
CERN, Geneva, Switzerland
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
1386
Lastpage :
1388
Abstract :
Two insertions (IR3, IR7) of the Large Hadron Collider (LHC) are dedicated to beam cleaning with the design goals of absorbing part of the primary beam halo and of the secondary radiation. The tertiary halo which escapes the collimation system in IR7 may heat the cold magnets at unacceptable levels, if no additional absorber is used. In order to assess the energy deposition in sensitive components, extensive simulations were run with the Monte Carlo cascade code FLUKA. The straight section and the dispersion suppressors (DS) of IR7 were fully implemented. A modular approach in the geometry definition and an extensive use of user-written programs allowed the implementation of all magnets and collimators with high precision, including flanges, steel supports and magnetic field. This paper provides the number and location of additional absorbers needed to keep the energy deposition in the coils of the magnets below the quenching limit.
Keywords :
Cleaning; Colliding beam devices; Collimators; Flanges; Geometry; Large Hadron Collider; Magnetic fields; Magnets; Monte Carlo methods; Steel;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1590770
Filename :
1590770
Link To Document :
بازگشت