Title :
Considerations in applying short circuit tests for on-site commissioning of ipp mid-size generators
Author :
Rifaat, Rasheek M.
Author_Institution :
Jacobs Canada Inc.
Keywords :
Circuit testing; Distributed power generation; Frequency synchronization; Guidelines; Mesh generation; Performance evaluation; Power generation; Protection; Safety; System testing;
Conference_Titel :
Industrial and Commercial Power Systems Technical Conference, 2004 IEEE
Print_ISBN :
0-7803-8419-9
DOI :
10.1109/ICPS.2004.1314985