• DocumentCode
    3204626
  • Title

    Cycle-to-Cycle Extraction Synchronization of the Fermilab Booster for Multiple Batch Injection to the Main Injector

  • Author

    Zwaska, R. ; Kopp, S. ; Pellico, W.

  • Author_Institution
    University of Texas at Austin, Austin, TX 78712, USA, zwaska@mail.hep.utexas.edu
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    1802
  • Lastpage
    1804
  • Abstract
    We report on a system to ensure cycle-to-cycle synchronization of beam extraction from the Fermilab Booster accelerator to the Main Injector. Such synchronization is necessary for multiple batch operation of the Main Injector for the Run II upgrade of anti-proton production using slip-stacking in the Main Injector, and for the NuMI (Neutrinos at the Main Injector) neutrino beam. To perform this task a system of fast measurements and feedback controls the longitudinal progress of the Booster beam throughout its acceleration period by manipulation of the transverse position maintained by the LLRF (Low-level Radio Frequency) system.
  • Keywords
    Acceleration; Accelerometers; Feedback control; Frequency measurement; Frequency synchronization; Neutrino sources; Particle beams; Performance evaluation; Position measurement; Production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1590918
  • Filename
    1590918