DocumentCode
3205171
Title
A new scheduling algorithm based on approximate reasoning for manufacturing applications
Author
Murugesan, San ; Deshpande, Yogesh ; Jamdagni, Aruna
Author_Institution
Fac. of Bus. & Technol., Univ. of Western Sydney, Macarthur Campbelltown, NSW, Australia
fYear
1995
fDate
5-7Jan 1995
Firstpage
133
Lastpage
137
Abstract
The key to efficiency of manufacturing operations is the ability to schedule various operations involved in the process effectively. Yet, scheduling is an exercise which is not resolvable in unique logical terms for most of the practical situations. Elimination methods, which classify jobs as dominant or front-runners, help to solve the problem using branch-and-bound techniques; however, the subset of the real-life manufacturing problems that satisfy the conditions imposed by the elimination methods is fairly small. To improve upon the range of their applicability, we present a new hierarchical scheduling algorithm based on approximate and heuristic reasoning, resembling the approaches followed by humans. It generates a schedule by tolerating small differences in satisfying inequality conditions on processing times rather than strict evaluation of conditions and by considering those jobs that meet most of the conditions on processing times except one or two as dominant jobs with different degrees of dominance
Keywords
inference mechanisms; operations research; optimisation; production control; approximate reasoning; branch-and-bound techniques; heuristic reasoning; hierarchical scheduling; inequality conditions; manufacturing operations; Australia; Business; Humans; Job shop scheduling; Manufacturing processes; Optimal scheduling; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Automation and Control, 1995 (I A & C'95), IEEE/IAS International Conference on (Cat. No.95TH8005)
Conference_Location
Hyderabad
Print_ISBN
0-7803-2081-6
Type
conf
DOI
10.1109/IACC.1995.465855
Filename
465855
Link To Document