DocumentCode
3205871
Title
Status of the ISAC-II Accelerator at Triumf
Author
Laxdal, R.E. ; Andersson, W. ; Bricault, P. ; Bylinskii, I. ; Fong, K. ; Marchetto, M. ; Mitra, A.K. ; Poirier, R.L. ; Rawnsley, W.R. ; Schmor, P. ; Sekachev, I. ; Stanford, G. ; Stinson, G. ; Zviagintsev, V.
Author_Institution
TRIUMF, Vancouver, BC, V6T2A3, Canada
fYear
2005
fDate
16-20 May 2005
Firstpage
2003
Lastpage
2005
Abstract
A heavy ion superconducting linac is being installed at TRIUMF to increase the final energy of radioactive beams at ISAC. A first stage of 20MV consisting of five medium beta cryomodules each with four quarter wave bulk niobium cavities and a superconducting solenoid is being installed with initial beam commissioning scheduled for Dec. 2005. The initial cryomodule has met cryogenic and rf performance specifications. In addition we have demonstrated acceleration of alpha particles in an off-line test. A 500 W class refrigerator system has been installed and commissioned in Jan. 2005 with cold distribution due for commissioning in Sept. 2005. A transfer beamline from the ISAC accelerator and beam transport to a first experimental station are being installed. The status of the project is presented.
Keywords
Alpha particles; Cryogenics; Ion accelerators; Life estimation; Linear particle accelerator; Niobium; Particle accelerators; Refrigeration; Solenoids; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1590988
Filename
1590988
Link To Document