• DocumentCode
    3208166
  • Title

    Performance of the PEP-II B-Factory Collider at SLAC

  • Author

    Seeman, J. ; Browne, M. ; Cai, Y. ; Colocho, W. ; Decker, F.J. ; Donald, M. ; Ecklund, S. ; Erickson, R. ; Fisher, A. ; Fox, J. ; Heifets, S. ; Iverson, R. ; Kulikov, A. ; Li, N. ; Novokhatski, A. ; Ross, M. ; Schuh, P. ; Smith, T. ; Sonnad, K. ; Stanek,

  • Author_Institution
    SLAC, Menlo Park, CA 94025, seeman@slac.stanford.edu
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    2369
  • Lastpage
    2371
  • Abstract
    PEP-II is an e+e-asymmetric B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV x 9 GeV). It has reached a luminosity of 9.21×1033/cm2/s and has delivered an integrated luminosity of 710 pb-1in one day. PEP-II has delivered, over the past six years, an integrated luminosity to the BaBar detector of over 262 fb-1. PEP-II operates in continuous injection mode for both beams boosting the integrated luminosity. The peak positron current has reached 2.45 A in 1588 bunches. Steady progress is being made in reaching higher luminosity. The goal over the next several years is to reach a luminosity of 2.1x1034/cm2/s. The accelerator physics issues being addressed in PEP-II to reach this goal include the electron cloud instability, beam-beam effects, parasitic beam-beam effects, high RF beam loading, shorter bunches, loweryinteraction region operation, and coupling control. Figure 1 shows the PEP-II tunnel.
  • Keywords
    Boosting; Clouds; Detectors; Electron accelerators; Electron beams; Particle beams; Physics; Positrons; Radio frequency; Resonance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591113
  • Filename
    1591113