DocumentCode :
3208166
Title :
Performance of the PEP-II B-Factory Collider at SLAC
Author :
Seeman, J. ; Browne, M. ; Cai, Y. ; Colocho, W. ; Decker, F.J. ; Donald, M. ; Ecklund, S. ; Erickson, R. ; Fisher, A. ; Fox, J. ; Heifets, S. ; Iverson, R. ; Kulikov, A. ; Li, N. ; Novokhatski, A. ; Ross, M. ; Schuh, P. ; Smith, T. ; Sonnad, K. ; Stanek,
Author_Institution :
SLAC, Menlo Park, CA 94025, seeman@slac.stanford.edu
fYear :
2005
fDate :
16-20 May 2005
Firstpage :
2369
Lastpage :
2371
Abstract :
PEP-II is an e+e-asymmetric B-Factory Collider located at SLAC operating at the Upsilon 4S resonance (3.1 GeV x 9 GeV). It has reached a luminosity of 9.21×1033/cm2/s and has delivered an integrated luminosity of 710 pb-1in one day. PEP-II has delivered, over the past six years, an integrated luminosity to the BaBar detector of over 262 fb-1. PEP-II operates in continuous injection mode for both beams boosting the integrated luminosity. The peak positron current has reached 2.45 A in 1588 bunches. Steady progress is being made in reaching higher luminosity. The goal over the next several years is to reach a luminosity of 2.1x1034/cm2/s. The accelerator physics issues being addressed in PEP-II to reach this goal include the electron cloud instability, beam-beam effects, parasitic beam-beam effects, high RF beam loading, shorter bunches, loweryinteraction region operation, and coupling control. Figure 1 shows the PEP-II tunnel.
Keywords :
Boosting; Clouds; Detectors; Electron accelerators; Electron beams; Particle beams; Physics; Positrons; Radio frequency; Resonance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN :
0-7803-8859-3
Type :
conf
DOI :
10.1109/PAC.2005.1591113
Filename :
1591113
Link To Document :
بازگشت