DocumentCode
3209760
Title
First results of an aimed research carried out by the Italian PT Ministry related to a prototypical photovoltaic hybrid power system for TLC
Author
Gregorio, R.D. ; Piccolo, M. ; Biondini, D. ; Goglia, G.
Author_Institution
Istituto Superiore PT, Roma, Italy
fYear
1988
fDate
30 Oct-2 Nov 1988
Firstpage
475
Lastpage
480
Abstract
An experimental PV (photovoltaic) plant integrated with a diesel electric generator (DEG) has been implemented in the ISPT (Istituto Superiore PT). A year and a half after its installation the first experimental phase aimed at investigating the problems related to multisubsystem assembly has been achieved. The authors report on the charge adjusting system from PV to battery, control criteria on the state of charge of battery cells, and ways of DEG intervention for an optimal energy balance to gradually introduce subsystems into the project. The second experimental phase has been performed for six months with the aim of collecting and processing data which will make it possible to check the fitness of the project with respect to wind plant integration. The philosophy of data acquisition and processing is illustrated
Keywords
diesel-electric generators; radio stations; solar cell arrays; Istituto Superiore PT; charge adjusting system; control criteria; data acquisition; data processing; diesel electric generator; photovoltaic hybrid power system; radio link station; state of charge; wind plant integration; Availability; Batteries; Buildings; Control systems; Hybrid power systems; Meteorology; Photovoltaic systems; Prototypes; Radio link; Solar power generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 1988. INTELEC '88., 10th International
Conference_Location
San Diego, CA
Type
conf
DOI
10.1109/INTLEC.1988.22394
Filename
22394
Link To Document