DocumentCode :
3211014
Title :
Retrofit-a realistic option for switchgear replacement
Author :
Blakeley, R.
fYear :
1997
fDate :
35487
Firstpage :
42522
Lastpage :
42524
Abstract :
The author describes how retrofitting can be a cost-effective way of replacing LV and HV distribution switchgear, keeping outage work and power system disruptions to a minimum, whilst upgrading the switchgear, control, protection and drawings. With the anticipated minimum of 25 years plant life extension, the large capital funding that would be required to replace whole switchboards can be avoided by the use of retrofitting in asset replacement programmes
fLanguage :
English
Publisher :
iet
Conference_Titel :
Can I Afford to Lose My Main Switchboard - The Management of Aged Oil-filled Switchgear in Industrial and Commercial Environments, Symposium on (DIgest No: 1997/079), IEE Colloquium on
Conference_Location :
Middlesbrough
Type :
conf
DOI :
10.1049/ic:19970447
Filename :
643218
Link To Document :
بازگشت