DocumentCode
3211648
Title
The Assembly of the LHC Short Straight Sections (SSS) at CERN: Project Status and Lessons Learned
Author
Parma, V. ; Bourcey, N. ; Campos, P. ; Feitor, R. ; Gandel, M. ; Lopez, R. ; Schmidlkofer, M. ; Slits, I.
Author_Institution
CERN, Geneva, Switzerland
fYear
2005
fDate
16-20 May 2005
Firstpage
2890
Lastpage
2892
Abstract
The series production of the LHC SSS has started in the beginning of 2004 and is foreseen to last until end 2006. The production consists in the assembly of 474 cold masses housing superconducting quadrupoles and corrector magnets within their cryostats. 87 cold mass variants, resulting from various combinations of main quadrupole and corrector magnets, have to be assembled in 55 cryostat types, depending on the specific cryogenic and electrical powering schemes required by the collider topology. The assembly activity features the execution of more than 5 km of leak-tight welding of stainless steel and aluminium cryogenic lines, designed for 20-bar pressure, according to high qualification standards and undergoing severe QA inspections. Some 2500 leak detection tests, using He mass spectrometry, are required to check the tightness of the cryogenic circuits. Extensive electrical control work, to check the integrity of the magnet instrumentation and electrical circuits throughout the assembly of the SSS, is also carried out. This paper presents the current status of production, the assembly facilities at CERN, work organisation and Quality Assurance issues, and the acquired assembly experience after one and a half years of production.
Keywords
Aluminum; Assembly; Circuit testing; Cryogenics; Large Hadron Collider; Mass production; Steel; Superconducting magnets; Topology; Welding;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
Print_ISBN
0-7803-8859-3
Type
conf
DOI
10.1109/PAC.2005.1591304
Filename
1591304
Link To Document