• DocumentCode
    3212141
  • Title

    New and Efficient Neutrino Factory Front-End Design

  • Author

    Gallardo, J.C. ; Berg, J.S. ; Fernow, R.C. ; Kirk, H. ; Palmer, R.B. ; Neuffer, D. ; Paul, K.

  • Author_Institution
    BNL, Upton, NY 11973, USA, gallardo@bnl.gov
  • fYear
    2005
  • fDate
    16-20 May 2005
  • Firstpage
    2986
  • Lastpage
    2988
  • Abstract
    The front-end of a neutrino factory (the part of the facility between the target and the first linear accelerator) represented a large fraction, about 40%, of the total facility costs as discussed in a rather comprehensive feasibility study (FS2) [1]. Several recent developments, briefly summarize in this article, lead to the idea that a new design for the front end may be possible and that it is significantly less expensive than the front end used in FS2.
  • Keywords
    Cooling; Frequency; Linear accelerators; Mars; Mesons; Neutrino sources; Production facilities; Protons; Solenoids; Superconducting coils;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2005. PAC 2005. Proceedings of the
  • Print_ISBN
    0-7803-8859-3
  • Type

    conf

  • DOI
    10.1109/PAC.2005.1591337
  • Filename
    1591337