• DocumentCode
    3213798
  • Title

    Scheduling CCGTs in the electricity pool

  • Author

    Birch, A.P. ; Smith, M.M. ; Özveren, C.S.

  • Author_Institution
    Scottish Hydro Electr., UK
  • fYear
    1996
  • fDate
    18-20 Mar 1996
  • Firstpage
    20
  • Lastpage
    24
  • Abstract
    This paper presents a review of the scheduling problem of nontraditional generators in England and Wales. It discusses the problems that have been faced, since the privatisation of the industry in England and Wales, by the new tranche of generation which is unable to conform to the classical bidding structure of the original CEGB plant. The more recent capacity comprises combined gas turbines and steam turbines. Such units which may operate as a single unit, or combination of other like units and/or a steam turbine. It is not possible to create a bid pattern for these interlinked modes of operation which fully reflects the cost structure which is represented by the existing three point linear fit. This paper reviews different methodologies that were considered for the scheduling of CCGTs to account for their own unique constraint characteristics and modes of operation. It reports in detail the method that was favoured by a number of the actual CCGT operators, from a technical and economic view point
  • Keywords
    combined cycle power stations; combined cycle gas turbines; combined gas turbines and steam turbines; economic view point; electricity pool; industry privatisation; scheduling; technical view point;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Opportunities and Advances in International Electric Power Generation, International Conference on (Conf. Publ. No. 419)
  • Conference_Location
    Durham
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-655-5
  • Type

    conf

  • DOI
    10.1049/cp:19960111
  • Filename
    643436